Krk Bridge: Tolls, Bora Closures and Facts About the Bridge

Krk Bridge: Tolls, Bora Closures and Facts About the Bridge

The Krk Bridge (Croatian “Krčki most”) connects the island of Krk to the mainland. For almost all guests it is the gateway to their holiday. Here is everything important: whether it costs anything, what happens during the bora, and where to check the current situation.

Is there a toll on the Krk Bridge?

No. Since 15 June 2020, crossing the Krk Bridge is free – in both directions and for all vehicles.

Closures during the bora

The bora is a cold, gusty north-east wind. On the bridge it can become very strong. Then driving bans apply, graded by vehicle type. First motorbikes, caravans, vehicles with trailers and double-decker buses are affected. With stronger wind, high vans and delivery vans follow. In hurricane-force gusts the bridge is closed to all vehicles. There is no fixed limit; the decision depends on the situation.

There is no replacement ferry to the mainland during a closure. Usually you have to wait until the wind drops – often a few hours. Especially in autumn and winter, check the traffic situation before you set off.

Where can I see the current status?

The Croatian Automobile Club HAK reports closures on its website hak.hr and in the app “Croatia Traffic Info”, with webcams. By phone, HAK traffic info is available from abroad at +385 1 464 0800. The motorway company HAC also shows road conditions on hac.hr. On Hello Krk you can see the traffic camera at the Krk Bridge and the weather with wind warnings.

Facts about the bridge

The bridge opened on 19 July 1980 after about four years of construction. Including the approaches it is 1,430 metres long. Two reinforced-concrete arches rest on the small island of Sveti Marko in the middle: the large arch spans 390 metres, the small one 244 metres. Under the large arch ships have about 67 metres of clearance. When it opened, the bridge had the longest concrete arch in the world – a record it held until the late 1990s.

Water pipes and the oil pipeline from the terminal in Omišalj also run across the bridge. Just beyond the bridge on Krk lies Rijeka Airport, only about one kilometre from Omišalj.

Is a new bridge coming?

Yes, it is being planned. The motorway company HAC signed the design contract in 2024. The plan is a two-level bridge of about 850 metres roughly one kilometre south of today's: cars on top, a railway below. There is no fixed date yet. Completion is not expected before around 2030 at the earliest.

Tips for the drive

In bora, and with a caravan or motorbike, check the traffic situation before leaving. In high season there can be queues before the bridge on Saturdays – leaving early helps. In the Hello Krk trip planner you will find a checklist for the journey with vignettes and tolls under “My trip”.